Operational Testing

Operational Testing

Paper Based Testing and One to One platform testing are essential for a successful TDL implementation. In how far the platform implementation is not only according to the specification (STANAG), but also supports the operational user requirements can only be proofed in operational testing, if possible in a multilink environment.
The LINTACS GmbH looks into this business field for more than 10 years. Interoperability tests in preparation and implementation of major exercises, such as ELITE and JPOW, are part of our daily business and we were acting in a managerial capacity.
In this difficult technical-tactical environment, the strength of more than 35 years of operational background in NATO Integrated Air and Missile Defense and more than 15 years of experience in programming and testing of TDL implementation pays off.

1: By Krasimir Grozev (Own work) CC-BY-SA-3.0 or GFDL; 2: By Soldatnytt from Oslo, Norway, CC-BY-2.0; 3: By Mark Holloway from Beatty, Nevada, USA, CC-BY-2.0; 4: By Andreas Uhl; 5: By Stefan Gygas, Luftwaffe; 6: By MEADS International (MEADS International), CC-BY-SA-3.0; 7: By Peter Bakema, GFDL 1.2; 8: Nick-D at the English language Wikipedia, GFDL or CC-BY-SA-3.0; 9: By Torsten Schöne, Luftwaffe